We are a professional manufacture for beer brewery equipment. We are mainly making 100L, 200L, 300L, 500L, 1000L, 2000L , 5000L brewery system etc. We can produce the equipment according to our clients’ requirements.
system | Components | Specification |
Milling System | Miller | Double Roller:700rpm, 600rpm Drive Power: 0.55kw Output: 50kg/hr |
Brewhouse System | Mash/Lauter tun | Grain mashing, Lautering |
Brew Kettle/Whirlpool Tank | Wort boiling and whirlpool | |
Hot Water Tank | Hot water supply | |
Heat exchanger | One stage and two stage | |
Fermentation System | Fermentation Tank | Top manway/Side manway Drying hop port to brew IPA Glycol Dimple jacket Carbonation port to fill CO2 |
Yeast Adding Tank(option) | SUS304 Stainless Steel | |
Cooling System | Glycol tank | Equipped with PU level indicator |
Glycol Chiller | Glycol water chilling (2HP) Power supply: 3*220V/60Hz | |
Cleaning System | Cleaning, sanitizing and sterilization of vessels and pipes in the brewery | |
Control System | Control Cabinet | Manual/Semi-automatic/Automatic |
All components & parameters can be customized according your requests. |
Brewery System:
Output/Brew | 200L | 300L | 500L | 600L | 800L | 1000L |
Brew / Week | 2~6 | 2~6 | 2~6 | 2~6 | 2~6 | 2~6 |
Output / Week | 400~1200L | 600~1800L | 1000~3000L | 1200~3600L | 1600~4800L | 2000~6000L |
Electric Supply | 3phase/380(220, 415,440…)v/50 (60)Hz Single Phase/ 220(110, 240…)v/50(60)Hz | |||||
Heating Source | Electric/Steam | |||||
Area Request | >25M2 | >30M2 | >45M2 | >50M2 | >60M2 | >70M2 |
Brew master | 1 | 1 | 1 | 1 | 1 | 1 |
1000L brew system
micro brew system
5000L brew system
Beer Brewery System
Brewery System Processing:
Our stainless plate import from Korea or China famous brand, also the surface treating could reach 2B standard.
micro brew system
Polishing accuracy could reach 0.4um, while the welding is the fish scale welding with beautiful pattern.
micro brew system
After sale service
- Free consultation service before, during, and after sales;Layout plan in 3D or CAD drawings of your brewery;
- Professional engineers going abroad for the installation,debugging,and training,all the travelling cost and locate food and hotel shall be afforded by the buyer
- The installation period is about 15 days including assembling brewing tanks and training the operater. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.
- Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.
- Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately.
- If needed, cost calculate additionally.
- Brewing technology,brewing formula,can be offered available
- More spare parts are available to offered freely.