It is a complete new built brewery which locates in Germany. After a while of talking about the capacity for this brewery, we stepped into the brewery floor plan design. It is not hard to place tanks into a new location. All tanks should be placed according to brewing process from malt milling, mashing, fermenting to packaging and function areas like hot energy area, cool energy area, mashing area, fermentation area and packing area etc. We got initial draft idea and then fulfill this idea by professional drawings.
After all of the documents works finished, this brewery system was transferred to production process as planned. All brewery tanks will be produced according to the established process, stainless steel plate, valves, pumps and fittings preparation, ss plate cutting and rolling, inside polishing, jacket cover, mash tun or fermenter tank assembling, tank and jacket leakage testing, exterior shell covering and assembling, final polishing and testing, ss passivation, piping and mechanical works, complete testing of the whole system including pumps, chillers, millers etc.
The brewery building has been ready before our tanks arrived. Place all tanks in their right position as in the floor plan; Adjust the foot pads to make sure all tanks horizontal and vertical; Then glycol piping and brewhouse piping were connected; Connect the electric cables; Build the steam supply lines; finally this beer brewing sytem was ready for commissioning. If everything works well for two days, we can do the insulation work for brewery glycol cooling system. Everything was done. The next step was to waiting for prepare several type of pet craft beer for the Openning Day.