Matching Parameter | Three pumps. three tank without insulating layer | ||||||
Tank Parameter | Three tank,single tank 100L without insulating layer | ||||||
Heater Way | Steam heater in two tanks( caustic and hot water | The table can rise or not | No | ||||
Tank Insulating Layer | No | ||||||
Spear Type | A,S,D,M OR G ONE OF THEM | Filling Part With Flowmeter Or Not | No | ||||
Power | 380V 3phase 50Hz 15KW | According To Customers Power Standard | |||||
Size(L*W*H) | 1.65*1.60*2.25M package: 1.85*1.75*2.50M | Package | Composite Borad Box | ||||
Equipment explaination | 1. It is use the Siemens S7-200 controller and Schneider buttons and knobs. 2. Separate pipe systems of keg washing part and filling part. It own steam sterilize that is suit for stainless steel beer keg and also has acid neutralize function. 3. Fill way is invert.The machine will stop until full. 4. You can clean all pipe with CIP system on filling part. 5. The whole machine use the stainless steel AISI304. All pipe welding use orbital welding system. Pipe inside and outside are clean and sanitation. Washing working procedure: Pressing→air blowing/drain off→water washing→air blowing/drain off→hot caustic washing→air blowing/to caustic box→hot water washing→air blowing/drain off→Acid washing→air blowing/to Acid-water box→hot water washing→air blowing/ drain off → steam sterilized (air blowing/drain off) →co2 blowing/drain off→co2 pressure preparing→cylinder return Filling working procedure: Pressing→steam sterilize keg spear →open the spear→co2 pressure preparing→filling→close the spear→washing spear surface→drain off→cylinder return |