Beer keg Washing and Filling Machine
Automatic beer keg washing and filling machine
2018-05-30
Industrial Brewing Equipment
10000L Industrial Brewing Equipment
2017-07-03

Beer Keg Washing and Filling Machine

Matching ParameterTwo pumps、two  tanks without insulating layer,hot water need connect with the other source
Tank ParameterTwo tanks,single tank 100L without insulating layer, one is caustic tank, the other one is acid tank.  )
Heater WayElectrical heater incaustic  tanksThe table can rise or notYes
Tank Insulating LayerNo
Spear TypeA,S,D,M OR G ONE OF THEMFilling Part With Flowmeter Or NotNo
Power380V 3phase 50Hz 8KWAccording To Customers Power Standard
Size(L*W*H)1.23*1.15*2.02M                          package: 1.35*1.23*2.25MPackageComposite Borad Box
Equipment explaination

1. It is use the Siemens S7-200 controller and Schneider air break swtich,,Taiwan AirTAC solenoid valve,pump is Chinese Yuehua, if have flowmeter, we choose German Burkert.

2. Separate pipe systems of keg washing part and filling part. It own steam sterilize that is suit for stainless steel beer keg and also has acid neutralize function. It can use the washing parts to do CIP to filling part.

3. Use couplers to connect with keg, keep pressure in a keg, no beer lost.The machine will stop until full.

4. The whole machine use the stainless steel AISI304. All pipe welding use orbital welding system. Pipe inside and outside are clean and sanitation.

Washing working procedure: Pressing→air blowing/drain off→water washing→air blowing/drain off→low flow hot water washing spear→Rinse keg surface with hot water→ air blowing/drain off→low flow hot caustic washing spear→Rinse keg surface with caustic→air blowing/to caustic box→low flow hot water washing spear→Rinse keg surface with hot water washing→air blowing/drain off→low flow acid washing spear→Rinse keg surface with acid→air blowing/to acid box→low flow hot water washing spear→Rinse keg surface with hot water washing→air blowing/drain off→steam sterilized → steam keep pressure sterilized→ →co2 blowing/drain off→brew water rinse cooling keg →co2 blowing/drain off→co2 pressure preparing→cylinder return Filling working procedure: Pressing→open spear by hand→fill Co2→filling →close spear by hand


Related Products