500L craft brewery system
500L craft brewery system in Finland
2018-08-01
300L steam heating way beer equipment from our Thailand customer
300L steam heating way beer equipment from our Thailand customer
2018-08-01

600L Beer Brewery Equipment from our Switzerland customer


It is a great honor in hear tell you guys something about me and our Swiss customer, but right now we are not only just business partner but also have good friendship.
In here, do not have too much information about the brewery equipment Configuration or what we do for customer.
Just want to share a story about :if you have dream, you should protect it. sharing an old man how to protect his dream.

Switzerland customer

Part one: Step by step achieve dreams.

Step by step achive dreams.

“In every glass of beer lies the experience of countless generations.” Erich Kaestner

1. “Die 80 Liter Brauerei in Rothenburg ab 2004. ” In 2004, Mr. Rudolf was just a home brewing enthusiast, and he enjoyed the fun of brewing for his family. He did his best keep his family have beer can be drink every day, every week, every festival.

Die 80 Liter Brauerei in Rothenburg ab 2004

2. “Die 150 Liter Brauerei in Eich ab 2013.” Since he gladly took these beers at our own music concerts, these 80 liters were quickly too tight and the hobby brewery was expanded to 150 liters capacity.

Die 150 Liter Brauerei in Eich ab 2013

3. “Blattmann Bier 2017” Much of the approximately 6000-year-old brewing history (perhaps it is much older) has been lost or forgotten by industrialization and impersonal mass production. In January 2017, they decided to install a professional  our brewery equipment. The old brewery town Lucerne was moved to the beautiful Ägerital. Today’s size allows them to brew ancient tradition beer in a professional environment.

Blattmann Bier 2017

Part Two: Sweat brings hope.

When the lights go down,When you’re stuck here in your dream with nowhere to go, you should worked all week for your dream, just like Mr.Rudolf.

After his day work, he check the brewery equipment technical specification, he check about the brewery equipment drawings: he check the brewery equipmetn qality control documents;he check the brewery equipment install layout. he check the production process pictures.Then he starting work for his brewhouse building, re-build the building by himself: New floor, dismantling shelves, installing electricity, digging drains. You can not imagine what Rudolf had gone through for his dream, and fortunately he succeeded.

How many thirteen years in your whole life? How many people can insist on thirteen years working hard for his dream? How many people give up his dream in 1 year?

We are so glad have a chance support a great man and his dream, we are so glad have chance grow up with his dream, we are so glad our brewery equipment Witnessed the spirit of not yielding.

Sweat brings hope.

How many thirteen years in your whole life?
How many people can insist on thirteen years working hard for his dream?
How many people give up his dream in 1 year?
We are so glad have a chance support a great man and his dream, we are so glad have chance grow up with his dream, we are so glad.