1.Company Profile
Jinan Zhuoda Machinery Equipment Co., Ltd. has been producing beer equipment for 20 years. It mainly produces large-scale industrial beer equipment, factory-type craft beer equipment, hotel bar beer equipment, teaching experimental beer equipment, household beer equipment, fruit wine equipment and so on. At the same time, the company participated in the beer equipment upgrade project.
We have always been adhering to the spirit of craftsmanship, pursuing excellence; manufacture each product as make art. According to our philosophy, works need to be full of humanity and resonance as our life!
2.product description
The beer equipment is mainly composed of a malt milling system, mash system, fermentation system, cooling system, control system, and CIP cleaning system.
2.1.mash system
Micro-beer production basically follows the pure beer method, that is only need malt, water, hops, and yeast. The popular configuration is: mash tank, lauter tank, boiling /whirlpool tank. The mashing tank is used for malt impregnation and mash, the lauter tank is use
d for wort filtering and storage ,separation of hops, the boiling/whirlpool tank is used for boiling and separating the hot coagulum.
2.2.Fermentation equipment system
The fermentation mainly uses a conical fermenter and a horizontal fermenter. usually we use conical fermenter to fermentation.
2.3.Auxiliary equipment
Water treatment system; malt miller ; boiler: plate heat exchange; ice water tank and chiller; control system: CIP system.
Depending on the different of beer’s demand, the model, the price, and the price is also different.
3.Product configuration list
Item | Name | Type | quantity |
Milling system | Malt miller | 300 kg/h | 1 PC |
Mash system | Mash tank | 500 L | 1 PC |
Lauter tank | 500 L | 1 PC | |
Boiling/whirlpool tank | 500 L | 1 PC | |
Steam generator | form a complete set | 1 PC | |
Wort pump | 3 T/h | 1 PC | |
Mash pipelines | form a complete set | 1 PC | |
Plate heat exchange | 6 m2 | 1 PC | |
Yeast adding metering device | 5 L | 1 PC | |
Fermentation system | Fermentation tank | 500 L | 2 pc/4 pc/6 pc |
Cooling system | Brazed chiller | 5 P | 2 PC |
Ice water tank | 1000 L | 1 PC | |
Ice pump | 1 PC | ||
Cleaning system | Storage tank &Alkali tank | 50 L | 1 PC |
Control System | control cabinet | Digital screen | 1 PC |
4.Payment & Service
4.1.Service & Guarantee
a.) Project planning and design services;
b.) Free debugging instruction of equipment until everything is functional;
c.) Management of equipment’s long distance shipping from seller’s factory to named port or station by buyer;
d.) Training of equipment maintenance and operating personally;
e.) For the whole beer system, the warranty is 5 years since completing of machinery’s commissioning work. All main machine guarantee is 5 years,main machine refers to all tanks. All of the accessories and facilities , are guaranteed for one year. The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage.
4.2.Payment Terms
a.) 40% of the whole amount pay as down payment by T/T before production;
b.) The balance 60% paid before shipment after inspection by T/T.
4.3.Delivery Time
Within 40-55 working days after confirmation of the initial payment. Holiday will be automatically postponed to meet after the holidays. send the full set of drawings not more than 5 working days after confirmation of the initial payment. The production start only after my approval on the drawings.