100l fermentation tank
1000L fermentation tank
2019-10-10
500L Microbrewery Equipment
commercial beer equipment
2019-10-01

500L beer brewery equipment

1.Company Profile

Jinan Zhuoda Machinery Equipment Co., Ltd. has been producing beer equipment for 20 years. It mainly produces large-scale industrial beer equipment, factory-type craft beer equipment, hotel bar beer equipment, teaching experimental beer equipment, household beer equipment, fruit wine equipment and so on. At the same time, the company participated in the beer equipment upgrade project.

We have always been adhering to the spirit of craftsmanship, pursuing excellence; manufacture each product as make art. According to our philosophy, works need to be full of humanity and resonance as our life!

2.product description

The beer equipment is mainly composed of a malt milling system, mash system,  fermentation system, cooling system,  control system, and  CIP cleaning system.

2.1.mash system

Micro-beer production basically follows the pure beer method, that is only need malt, water, hops, and yeast.   The popular configuration is: mash tank, lauter tank, boiling /whirlpool tank. The mashing tank is used for malt impregnation and mash, the lauter tank is use

d for wort filtering and storage ,separation of hops, the boiling/whirlpool tank is used for boiling and separating the hot coagulum.

2.2.Fermentation equipment system

The fermentation mainly uses a conical fermenter and a horizontal fermenter. usually we use conical fermenter to fermentation.

2.3.Auxiliary equipment

Water treatment system; malt miller  ; boiler: plate heat exchange; ice water tank and chiller; control system: CIP system.

Depending on the different of  beer’s demand, the model, the price, and the price is also different.

3.Product configuration list

 

ItemNameTypequantity
Milling systemMalt miller300 kg/h1 PC
Mash systemMash tank500 L1 PC
Lauter tank500 L1 PC
Boiling/whirlpool tank500 L1 PC
Steam generatorform a complete set1 PC
Wort pump3 T/h1 PC
Mash pipelinesform a complete set1 PC
Plate heat exchange6 m21 PC
Yeast adding metering device5 L1 PC
Fermentation systemFermentation tank500 L2 pc/4 pc/6 pc
Cooling systemBrazed chiller5 P2 PC
Ice water tank1000 L1 PC
Ice pump1 PC
Cleaning systemStorage tank &Alkali tank50 L1 PC
Control Systemcontrol cabinetDigital screen1 PC

 

4.Payment & Service

4.1.Service & Guarantee

a.) Project planning and design services;

b.) Free debugging instruction of equipment until everything is functional;

c.) Management of equipment’s long distance shipping from seller’s factory to named port or station by buyer;

d.) Training of equipment maintenance and operating personally;

e.) For the whole beer system, the warranty is 5 years since completing of machinery’s commissioning work. All main machine guarantee is 5 years,main machine refers to all tanks. All of the accessories and facilities , are guaranteed for one year. The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage.

4.2.Payment Terms

a.) 40% of the whole amount pay as down payment by T/T before production;

b.) The balance 60% paid before shipment after inspection by T/T.

4.3.Delivery Time

Within 40-55 working days after confirmation of the initial payment. Holiday will be automatically postponed to meet after the holidays. send the full set of drawings not more than 5 working days after confirmation of the initial payment. The production start only after my approval on the drawings.

 

发表回复

您的电子邮箱地址不会被公开。 必填项已用*标注